Kitchener, Ontario fire fighters were dispatched for a kitchen fire at 37 Edna Street at 19:20. A2 arrived on scene first reporting light white smoke coming from the eaves of the 1.5 story house. P3 pulled two 1.75” attack lines while P4 picked up the hydrant and pulled one 1.75” line from their pumper. The fire started in the rear of the house on the main floor and extended up to the second level. The fire was knocked down in 25 minutes, with extensive overhaul on both floors. Box 690 provided rehab. Photos and video taken 10 minutes into the fire. Units on scene Pump 2, 3, 4 (using spare pump 9) 5, Aerial 2, Rescue 1, and Car 23 (PC).
Kitchener (ON) fire dispatch received multiple calls for 36 Keller Crescent reporting a fully involved house fire, November 25 at 1:20. P5 arrived on scene reporting heavy fire showing from the garage extending up to the second floor. They also had two cars on fire in the driveway and siding melting on the house on the E4 side. A third pumper was added to the call and Box 690 was paged at this time. A 1.5” line was pulled to make a fast attack on the fire. As other firefighters arrived, a 2.5” and 1.5” line were also pulled. The fire was knocked down in 10 minutes with no extension to the interior. I arrived on scene at approximately 1:50. Shot a quick video and one shot of front of building.
Kitchener (ON) dispatch received multiple calls for shipping containers on fire at the rear of Sci-lab Material Testing at Beasley and Trillium Drive November 22. Pump 6 reported they had a black thermal column from a few blocks away. The initial report was the trailer on fire contained dust, and a second trailer contained diesel fuel. P6 firefighters pulled a 1.5” line to attack the fully involved trailer. The fire was knocked down in a couple of minutes. All shots taken approximately 10 minutes after the fire was knocked down. Box 690 provided rehab.
Kitchener (ON) fire dispatch received multiple calls for black smoke coming out of an abandoned building at 755 King Street East November 17, 2016 at 7:31. The building was formerly a used car dealership, and is just a block east of last week’s bar fire. Pump 2 could see the smoke as they got near the scene and requested an additional pumper. P2 firefighters pulled two 2.5” lines to attack the fire. A large pile of tires was burning in the front of the structure. The fire was knocked down in 25 minutes. Box 690 provided rehab.